If you're thinking about a free-standing solar array in the garden, the permitted development rules for houses in England were rewritten in SI 2026/896, which came into force on 27 August 2026.
For a house, the height of stand-alone solar is limited by the lowest applicable figure in this table:
- 1 metre, if any part is within 5m of the curtilage boundary and forward of a wall forming part of the principal elevation
- 2 metres, if any part is within 5m of the curtilage boundary
- 2 metres, in a conservation area, if it's nearer the highway than the nearest part of the house
- 4 metres, in any other case
The panel surface area is still capped at 9 square metres. It isn't permitted in the curtilage of a listed building or on a scheduled monument. In a conservation area where it would sit nearer the highway than the house, or on article 2(3) land (protected areas such as National Parks) within 5m of the boundary, there's a prior approval process with the council.
For plug-in solar specifically, it can't use this right if any part would be installed on a wooden fence, gate, wall or other enclosure.
Two caveats. These are the English rules, and they sit alongside the usual conditions about minimising impact on the area. Leasehold and tenancy terms are separate again.
Before looking at the garden, it's worth checking the roof is genuinely ruled out. Our guide to whether your roof is suitable for solar panels is a quick read.
If you're not sure, I'd email the local planning authority and ask for it in writing. Has anyone had a council confirm that a garden array falls under permitted development, and how long did they take?