Skip to discussions
Renewable Energy Hub Find an Installer Compare prices Detailed Quote
Installer Directory
Community forum Sign inJoin community
Invite to forum

Choose who to invite in your sharing app. They’ll still need to sign up or sign in to take part.

WhatsApp Email
Heat Pumps & Heating

Do you need planning permission for an air source heat pump in England? The rules since May 2026

Share thread
WhatsApp Email
Richard Burdett Admin: Current forum administrator.Super Contributor: Special recognition for the quality and helpfulness of contributions. Member ·
#90
Air source heat pumps are permitted development in England if all the limits and conditions are met, so no planning application is needed. From the Planning Portal's current list: - The installation has to comply with MCS planning standards (MCS 020a). From 28 May 2026 that's the only permitted certification scheme. - The outdoor compressor unit (including its housing) can't be bigger than 1.5 cubic metres on a house, or 0.6 cubic metres on a block of flats. - Only the first installation counts on a house that isn't detached or on a block of flats. On a detached house, the first two do. - Not on a pitched roof. On a flat roof it has to be at least one metre from the roof's outer edge. - Not within the curtilage of a listed building, or on a scheduled monument. - In a conservation area or World Heritage Site, it can't be on a wall or roof that faces a highway, or be nearer the highway than the building. - Elsewhere, it can't be on a wall above ground-floor level if that wall faces a highway. - It can't be used only for cooling, and it should be sited to minimise its effect on the building's appearance and the area. Permitted development rights can also be removed by an Article 4 direction or a planning condition, which is why it's worth checking with your local planning authority. That only covers planning, not noise or neighbours. We've talked about the noise side here: How do we avoid heat pump noise becoming a problem for neighbours? Our heat pump pros and cons guide also touches on the planning side, if you want a plainer summary. Has anyone had to ask a council for confirmation, and did they issue a lawful development certificate?
Share post
WhatsApp Email

Your experience could help someone.

Join to ask a follow-up or share your perspective.

Join to reply